TITLE OF PROJECT | H.429 REFERENCE Nr. DİYARBAKIR TRANSMISSION LINES |
---|---|
CLIENT | TURKISH ELECTRICITY TRANSMISSION CO |
CONTRACTOR | VAM ENG. CONT. TRA. LTD. CO. (As Main Contractor) |
DATE OF CONTRACT | JULY 2013 |
FINAL COMPLETION | APRIL 2014 |
CONTRACT VALUE | 8.100.000,00 TL (4.525.000 USD) |
BRIEF DESCRIPTION OF THE WORK | + Disassemble existing line +Material Supply + Erection of 154 kV 2x3x1272 MCM St/Al Transmission Line (33 km) , with Galvanized Bolted Steel Poles |